Summary
It is tunneling excavation method with preventing a disruption of rock masses using a rock bolt and shotcrete consider to rock’s mechanical property. This method has three keynotes. First, it is possible to construct in both way. Second, it is excellent to durability and economic feasibility of tunnel by using an initial ground as a girder. Lastly, it can be used widely from a mountain tunnel to underground tunnel of city.
Major Projects
-
Korea Ulsan Stockpile Underground Construction-Tunnel Excavation Work
-
Korea East Sea Line Pohang-Samchuk the Construction of Railway
-
Korea Mt. Cheonma Tunnel Construction/Tunnel Work
-
Korea Seoul Subway Line No.9 Section 922 Construction/Earth Work and Structure Work(Phase 3)
-
Korea Sosa-Wonsi Double Track Railway 4-3(Tunnel/Open)
-
Korea Kangnam Ring City highway Construction Phase 5-1