Major Performance

  • Korea Busan New Port Songdo dredged soil Ground Phase 2

    • Period 2012.10 ~ 2014.06
    • Client Busan Regional Office of Oceans and Fisheries
    • Location Changwon, Gyeongsangnam-do, Republic of Korea
    • Explanation Off-Shore DCM
  • Korea Wangsan Yachting Center of Incheon Asian Games

    • Period 2012.09 ~ 2013.12
    • Client Wangsan leisure Development Co., Ltd.
    • Location Incheon, Republic of Korea
    • Explanation Off-Shore DCM
  • Korea S-OIL NEW SPM

    • Period 2012.08 ~ 2013.10
    • Client S-OIL
    • Location Ulsan, Republic of Korea
    • Explanation Off-Shore DCM
  • Singapore DTL3 C937 Project/ TBM Operation Works at the Tunnel

    • Period 2012.08 ~ 2015.03
    • Client Singapore DTL3 C937 Project/ TBM Operation Works at the Tunnel
    • Location Singapore
    • Explanation D-wall, Bareette & DCM,
      Shield D=6,650mm
  • Singapore Balmoral Condominium Project

    • Period 2012.07 ~ 2012.12
    • Client Hong Leong Holding
    • Location Singapore
    • Explanation Bored Pile
  • Korea Saemankum New Port Breakwater Construction

    • Period 2012.07 ~ 2013.11
    • Client Public Procurement Service
    • Location Gunsan, Jeollabuk-do, Republic of Korea
    • Explanation Off-Shore DCM