Major Performance

  • Bahrain Muharraq STP AND SCS PROJECT FOR DGS TUNNELING WORKS (D1800MM)

    • Period 2013.01 ~ 2013.12
    • Client Ministry of Works
    • Location MUHARRAQ, KINGDOM OF BAHRAIN
    • Explanation Micro Tunneling, Desert Diamond
  • Singapore UIC Redevelopment D&P

    • Period 2013.01 ~ 2013.12
    • Client UIC Investments Pte
    • Location Shenton Way, Singapore
    • Explanation D-Wall, Bored Pile
  • Cambodia Acleda Bank Extension

    • Period 2013.01 ~ 2014.11
    • Client ACLEDA BANK PLC
    • Location Phnom Penh, Cambodia
    • Explanation D-wall, RCD
  • Kuwait Sheikh Jabar AI-Ahmad AI-Sabah Causeway Project(Main Link)

    • Period 2013.01 ~ 2015.02
    • Client MPW
    • Location Kuwait
    • Explanation Boring Investigation 269 piles, CPT 63 sites, Vane Test 89 sites, laboratory investigation, Rotary Coring Locations 3
  • Singapore North South Transmission Cable Tunnel NS2 Shield Tunnel

    • Period 2012.12 ~ 2018.06
    • Client SP Power Grid
    • Location Angmokio Ave1, Singapore
    • Explanation Slurry : Length-5,380(M), Diameter-6,950(mm)
      Ground : Gypsum, Mud stone, Silt stone
  • Korea Gamjeon District Sewer facility maintenance project(BTL)

    • Period 2012.12 ~ 2015.11
    • Client Busan Ecorian
    • Location Busan, Republic of Korea
    • Explanation Sewerage, pipeline construction : 117,255m
      Drainage facility : 7,766 households
      Manhole pump station : 31