Major Performance
-
Bahrain Muharraq STP AND SCS PROJECT FOR DGS TUNNELING WORKS (D1800MM)
-
Period
2013.01 ~ 2013.12
-
Client
Ministry of Works
-
Location
MUHARRAQ, KINGDOM OF BAHRAIN
-
Explanation
Micro Tunneling, Desert Diamond
-
Singapore UIC Redevelopment D&P
-
Period
2013.01 ~ 2013.12
-
Client
UIC Investments Pte
-
Location
Shenton Way, Singapore
-
Explanation
D-Wall, Bored Pile
-
Cambodia Acleda Bank Extension
-
Period
2013.01 ~ 2014.11
-
Client
ACLEDA BANK PLC
-
Location
Phnom Penh, Cambodia
-
Explanation
D-wall, RCD
-
Kuwait Sheikh Jabar AI-Ahmad AI-Sabah Causeway Project(Main Link)
-
Period
2013.01 ~ 2015.02
-
Client
MPW
-
Location
Kuwait
-
Explanation
Boring Investigation 269 piles, CPT 63 sites, Vane Test 89 sites, laboratory investigation, Rotary Coring Locations 3
-
Singapore North South Transmission Cable Tunnel NS2 Shield Tunnel
-
Period
2012.12 ~ 2018.06
-
Client
SP Power Grid
-
Location
Angmokio Ave1, Singapore
-
Explanation
Slurry : Length-5,380(M), Diameter-6,950(mm)
Ground : Gypsum, Mud stone, Silt stone
-
Korea Gamjeon District Sewer facility maintenance project(BTL)
-
Period
2012.12 ~ 2015.11
-
Client
Busan Ecorian
-
Location
Busan, Republic of Korea
-
Explanation
Sewerage, pipeline construction : 117,255m
Drainage facility : 7,766 households
Manhole pump station : 31