Major Performance

  • Singapore Thomson Line T213

    • Period 2014.04 ~ 2015.07
    • Client LTA
    • Location Singapore
    • Explanation D-Wall Method
  • Korea Haeundae LCT Construction

    • Period 2013.11 ~ 2015.04
    • Client LCT
    • Location Busan, Republic of Korea
    • Explanation Earthworks, underground continuous walls, on-site percussion piles, PRD, RJP, E/A, facilities, measurement management
  • Singapore Cable Tunnel NS2 Dwall

    • Period 2013.11 ~ 2018.05
    • Client SP Power Grid
    • Location Sembawang shaft, Singapore
    • Explanation Diapharagm Wall Method, Excavating:D=6,990mm
  • Korea Mt. Cheonma Tunnel Construction/Tunnel Work

    • Period 2013.10 ~ 2019.01
    • Client Mt. Cheonma Tunnel Corporation
    • Location Busan, Republic of Korea
    • Explanation NATM, 2 Lane 2Way tunnel Length 1.5km (Two-lane Tunnel in both direction)
  • Korea T2 Section Soil Excavation & Piling Constrution(Including Underground Structure of Station

    • Period 2013.10 ~ 2015.12
    • Client Incheon International Airport Corporation
    • Location Incheon, Republic of Korea
    • Explanation Diameter Φ2500 138 pieces,
      Diameter Φ2000  63 pieces
  • Singapore DTL STAGE2 C918A/Bored-Tunnel

    • Period 2013.09 ~ 2015.04
    • Client LTA
    • Location Singapore
    • Explanation Shield Tunnel 2
      ( S604 : 814m, S605 : 863m )
Youtube
CS CENTER