Major Performance

  • Singapore Thomson Line T216 (TSL)

    • Period 2015.08 ~ 2019.05
    • Client Singapore L.T.A
    • Location Singapore
    • Explanation Tunnel(Surry Shield TBM)
      Up line 1,430m / Down line 1460m
      (O/D 6.67M)
  • Singapore Thomson Line T216 Tunnel Operation

    • Period 2015.08 ~ 2019.05
    • Client LTA
    • Location Singapore
    • Explanation Total excavation extension: L = 2,880 m (1 Slurry TBM)
         - Excavation diameter: D=6,350 mm
         - -  North bound : 1,450m
         - -  South bound : 1,430m
      Invert L = 2,880 m
  • Korea Bujeon~Masan Build-Transfer-Lease Construction work / Bored Pile work(3,4 Zone)

    • Period 2015.03 ~ 2018.08
    • Client Smartrail Co., Ltd.
    • Location Busan, Republic of Korea
    • Explanation DCM Length : 80,809m, 189,376m (D=1,200mm, 2 drivers)
  • Singapore Stamford Diversion Canal Contract 2

    • Period 2015.03 ~ 2017.12
    • Client Public Utilities Board
    • Location Singapore
    • Explanation Shield Tunnel (E.P.B TBM)
  • Korea Gwangmyeong~Geumcheon Electric Power distribution Cable Tunnel/Shaft constuction

    • Period 2014.12 ~ 2021.03
    • Client KEPCO
    • Location Seoul, Republic of Korea
    • Explanation SHIELD TBM Tunnel (EPB) L = 1,867m
         - Excavation Diameter : D=3,550mm (weathered rock, lotus rock, hard rock)
      Three Natm tunnels (5.6m for transmission, 19.8m for distribution, and 217.5m for distribution)
  • Korea Wonju~Gangneung Railway Section No.11-3/Shield Tunnel

    • Period 2014.12 ~ 2017.05
    • Client Korea Rail Network Authority
    • Location Gangwon-do, Republic of Korea
    • Explanation Length - 1,160(M), Diameter - 8,410(mm)