ExplanationTunnel(Surry Shield TBM)
Up line 1,430m / Down line 1460m
(O/D 6.67M)
Singapore Thomson Line T216 Tunnel Operation
Period2015.08 ~ 2019.05
ClientLTA
LocationSingapore
ExplanationTotal excavation extension: L = 2,880 m (1 Slurry TBM)
- Excavation diameter: D=6,350 mm
- - North bound : 1,450m
- - South bound : 1,430m
Invert L = 2,880 m
Korea Bujeon~Masan Build-Transfer-Lease Construction work / Bored Pile work(3,4 Zone)
Korea Gwangmyeong~Geumcheon Electric Power distribution Cable Tunnel/Shaft constuction
Period2014.12 ~ 2021.03
ClientKEPCO
LocationSeoul, Republic of Korea
ExplanationSHIELD TBM Tunnel (EPB) L = 1,867m
- Excavation Diameter : D=3,550mm (weathered rock, lotus rock, hard rock)
Three Natm tunnels (5.6m for transmission, 19.8m for distribution, and 217.5m for distribution)
Korea Wonju~Gangneung Railway Section No.11-3/Shield Tunnel