Major Performance

  • Korea Yeosu New North Port Outskirts of Facility Construction/Marine DCM

    • Period 2015.11 ~ 2016.11
    • Client Yeosu Regional Maritime Affairs and Port Office
    • Location Yeosu, Jeollanam-do, Republic of Korea
    • Explanation Length : 183,489m (D=1,350mm, 4 drivers)
  • Korea Dangjin~Pyeongtaek area Electric Power Transmission Cable Tunnel

    • Period 2015.11 ~ 2020.01
    • Client KEPCO
    • Location Dangjin, Chungcheongnam-do, Republic of Korea
    • Explanation SHIELD TBM (Slurry) L=1.831m
         - Excavation Diameter : D=3,530 mm (soft rock, hard rock)
      Reach vertical length : Φ 9.0 × 63.7 m
  • Korea East Sea Line Pohang-Samchuk the Construction of Railway

    • Period 2015.11 ~ 2019.05
    • Client Korea Rail Network Authority
    • Location Uljin, Gyeongsangbuk-do, Republic of Korea
    • Explanation NATM, Length about 3.0km
  • Korea East Sea Line Pohang-Samchuk the Construction of Railway Phase9/Railway Section 2

    • Period 2015.11 ~ 2020.12
    • Client KOREA NATIONAL RAILWAY
    • Location Uljin, Gyeongsangbuk-do, Republic of Korea
    • Explanation Earthwork 1,700,695㎥, NATM 3,010M, Bridgework 385M
  • Korea Lotte Versalis SR Project

    • Period 2015.09 ~ 2016.05
    • Client LOTTE Versalis Elastomers Co., Ltd
    • Location Yeosu, Jeollanam-do, Republic of Korea
    • Explanation Application of vacuum pressure check device
      Vacuum preloading : over 88kPa
  • Singapore Advanced Work at Depot T3008

    • Period 2015.08 ~ 2018.03
    • Client LTA
    • Location 20 Koh Sek Lim Rd, Singapore
    • Explanation DCM : Length = 322,061m
      (D=1,300mm, 2drivers)
Youtube
CS CENTER