-
-
-
Major Performance
-
Korea Yeosu New North Port Outskirts of Facility Construction/Marine DCM
-
Period
2015.11 ~ 2016.11
-
Client
Yeosu Regional Maritime Affairs and Port Office
-
Location
Yeosu, Jeollanam-do, Republic of Korea
-
Explanation
Length : 183,489m (D=1,350mm, 4 drivers)
-
Korea Dangjin~Pyeongtaek area Electric Power Transmission Cable Tunnel
-
Period
2015.11 ~ 2020.01
-
Client
KEPCO
-
Location
Dangjin, Chungcheongnam-do, Republic of Korea
-
Explanation
SHIELD TBM (Slurry) L=1.831m
- Excavation Diameter : D=3,530 mm (soft rock, hard rock)
Reach vertical length : Φ 9.0 × 63.7 m
-
Korea East Sea Line Pohang-Samchuk the Construction of Railway
-
Period
2015.11 ~ 2019.05
-
Client
Korea Rail Network Authority
-
Location
Uljin, Gyeongsangbuk-do, Republic of Korea
-
Explanation
NATM, Length about 3.0km
-
Korea East Sea Line Pohang-Samchuk the Construction of Railway Phase9/Railway Section 2
-
Period
2015.11 ~ 2020.12
-
Client
KOREA NATIONAL RAILWAY
-
Location
Uljin, Gyeongsangbuk-do, Republic of Korea
-
Explanation
Earthwork 1,700,695㎥, NATM 3,010M, Bridgework 385M
-
Korea Lotte Versalis SR Project
-
Period
2015.09 ~ 2016.05
-
Client
LOTTE Versalis Elastomers Co., Ltd
-
Location
Yeosu, Jeollanam-do, Republic of Korea
-
Explanation
Application of vacuum pressure check device
Vacuum preloading : over 88kPa
-
Singapore Advanced Work at Depot T3008
-
Period
2015.08 ~ 2018.03
-
Client
LTA
-
Location
20 Koh Sek Lim Rd, Singapore
-
Explanation
DCM : Length = 322,061m
(D=1,300mm, 2drivers)