Major Performance
-
Korea Incheon LNG Phase-II TK-215,216,217,218
-
Period
1999.06 ~ 2001.06
-
Client
Daewoo E&C
-
Location
Incheon, Republic of Korea
-
Explanation
G/W Length : 1,016 m
Thickness : 1700mm ~ 1800mm
Depth : 70.0m
-
Korea Naksan Bridge Piling Work and Connection Road Construction
-
Period
1999.05 ~ 1999.12
-
Client
Yangyang County Office
-
Location
Yangyang Gangwon, Republic of Korea
-
Explanation
hole round : Φ1,500 mm
Bon Number : 45 Bon
Maximum depth : 67 m
-
Korea Gas Pipe Line Across Keum River
-
Period
1998.12 ~ 2000.12
-
Client
Korea Gas Corporation
-
Location
Sejong, Republic of Korea
-
Explanation
Slurry
Length-1,113(M)
Diameter-3,050(mm)
GROUND : soft ground Soil
-
Korea Seoul-Busan Train Express Railway C9-2
-
Period
1998.09 ~ 2002.06
-
Client
Korea National Railway
-
Location
Gyeongbuk, Republic of Korea
-
Explanation
Sectional area : 138m2
Extended Length : 2,084 m
Rock Type : Hard Rock, NATM + OPEN TUNNEL
-
Korea Masan Bay LNG Pipe Line Across
-
Period
1997.11 ~ 2001.02
-
Client
Korea Gas Corporation
-
Location
Changwon Gyeongnam, Repubilc of Korea
-
Explanation
Slurry
LENGTH-1,354(M)
DIAMETER-1,850(mm)
GROUND : Soft rock
-
Korea Busan Subway Line-II Section-229
-
Period
1997.10 ~ 1999.12
-
Client
Hyundai E&C
-
Location
Busan, Republic of Korea
-
Explanation
G/W Length : 1,200 m
Thickness : 1,200 mm
Depth : 38.0 m