Major Performance

  • Korea Incheon LNG Phase-II TK-215,216,217,218

    • Period 1999.06 ~ 2001.06
    • Client Daewoo E&C
    • Location Incheon, Republic of Korea
    • Explanation G/W Length : 1,016 m
      Thickness : 1700mm ~ 1800mm
      Depth : 70.0m
  • Korea Naksan Bridge Piling Work and Connection Road Construction

    • Period 1999.05 ~ 1999.12
    • Client Yangyang County Office
    • Location Yangyang Gangwon, Republic of Korea
    • Explanation hole round : Φ1,500 mm
      Bon Number : 45 Bon
      Maximum depth : 67 m
  • Korea Gas Pipe Line Across Keum River

    • Period 1998.12 ~ 2000.12
    • Client Korea Gas Corporation
    • Location Sejong, Republic of Korea
    • Explanation Slurry
      Length-1,113(M)
      Diameter-3,050(mm)
      GROUND : soft ground Soil
  • Korea Seoul-Busan Train Express Railway C9-2

    • Period 1998.09 ~ 2002.06
    • Client Korea National Railway
    • Location Gyeongbuk, Republic of Korea
    • Explanation Sectional area : 138m2
      Extended Length : 2,084 m
      Rock Type : Hard Rock, NATM + OPEN TUNNEL
  • Korea Masan Bay LNG Pipe Line Across

    • Period 1997.11 ~ 2001.02
    • Client Korea Gas Corporation
    • Location Changwon Gyeongnam, Repubilc of Korea
    • Explanation Slurry
      LENGTH-1,354(M)
      DIAMETER-1,850(mm)
      GROUND : Soft rock
  • Korea Busan Subway Line-II Section-229

    • Period 1997.10 ~ 1999.12
    • Client Hyundai E&C
    • Location Busan, Republic of Korea
    • Explanation G/W Length : 1,200 m
      Thickness : 1,200 mm
      Depth : 38.0 m