Major Performance
-
Korea Telecommunication Line Across Han River
-
Period
2002.04 ~ 2005.04
-
Client
Korea Telecom Corporation
-
Location
Seoul, Republic of Korea
-
Explanation
Slurry
LENGTH-1,910(M)
DIAMETER-2,200(mm)
GROUND : complex stratum
-
Korea Jung-ang Railway Line No 9 / Earth Work and Structure Work
-
Period
2002.04 ~ 2011.12
-
Client
Korea Rail Network Authority
-
Location
Gangwon, Republic of Korea
-
Explanation
Sectional area : 92㎡
Extended Length : 680m
Rock Type : Hard Rock
-
Korea Daelim Electric Power Transmission Line
-
Period
2002.02 ~ 2003.12
-
Client
Korea Electric Power Corporation
-
Location
Seoul, Republic of Korea
-
Explanation
EPB+TBM
LENGTH-2,672(M)
DIAMETER-3,500(mm)
GROUND : Weathered Rock, Soft & Hard
-
Korea Woegwan Bridge Piling Work
-
Period
2001.02 ~ 2002.12
-
Client
Busan Construction and Management Administration
-
Location
Busan, Republic of Korea
-
Explanation
hole round : Φ1,500 mm
Bon Number : 180 Bon
Maximum depth : 22 m
-
India Dhauli Ganga Hydroelecric Power Generation Tunnel
-
Period
2000.01 ~ 2004.10
-
Client
NHPC
-
Location
Uttaranchal, India
-
Explanation
NATM 250,000m3, 4.0km
( DB 630m, SFT 700m, HRT 1,120m)
-
Korea Noksan Discharge Pipe Construction
-
Period
1999.12 ~ 2001.09
-
Client
Busan-si
-
Location
Busan, Republic of Korea
-
Explanation
Slurry, G/W Length : 1,587m
Thickness : 2,200(mm)