Major Performance
-
Korea Garakdong Electric Power Transmission Line
-
Period
2004.12 ~ 2009.11
-
Client
Korea Electric Power Corporation
-
Location
Seoul, Republic of Korea
-
Explanation
EPB, LENGTH : 2,459(M)
DIAMETER : 3,800(mm)
Ground : Soft & Hard rock
Equipment manufacturer : KAWASAWI Φ4550mm, JAPAN
-
Korea Incheon Airport Railroad Phase 2-5B
-
Period
2004.06 ~ 2008.08
-
Client
Incheon International Airport Corporation
-
Location
Incheon, Republic of Korea
-
Explanation
EPB
LENGTH-1,935(M)
DIAMETER-6,880(mm)
GROUND : weathering soil, Soft & Hard rock
-
Korea Busan Seomyean 1st Apartment Project
-
Period
2004.06 ~ 2007.02
-
Client
Namkwang E&C
-
Location
Busan, Republic of Korea
-
Explanation
G/W Length : 643 m
Thickness : 800 mm ~ 1200 mm
Depth : 30.0 m
-
Korea Seoul-Busan Train Express Railway C14-2 / Tunnel Work
-
Period
2004.05 ~ 2010.03
-
Client
Korea Train Express
-
Location
Busan, Republic of Korea
-
Explanation
Sectional area : 140m2
Extended Length : 8,324m
Rock Type : Hard Rock
-
Korea Seoul Metro Line 9 No.909
-
Period
2003.09 ~ 2009.12
-
Client
Public Procurement Service
-
Location
Seoul, Republic of Korea
-
Explanation
Slurry : Length-3,634(M), Diameter-7,800(mm)
Ground : Complex Stratum
-
Singapore DTSS-Kim Chuan Link sewer
-
Period
2002.05 ~ 2006.12
-
Client
Singapore PUB
-
Location
Singapore
-
Explanation
Diameter 1,000(mm), Length 990m