Major Performance

  • Korea Construction for Access Road to Yeosu National Industrial Complex (Phase 3)

    • Period 2008.05 ~ 2008.09
    • Client Jeollanam-do
    • Location Yeosu, Jeollanam-do, Republic of Korea
    • Explanation 52,056m (4 drivers)
  • Cambodia Gold Tower 42 Project

    • Period 2008.04 ~ 2009.12
    • Client Yon Woo Cambodia Co
    • Location Cambodia
    • Explanation Bored Pile
  • Donghae Railway Line Double-Track Electrification 2-B

    • Period 2008.03 ~ 2016.12
    • Client Korea Rail Network Authority
    • Location Busan, Republic of Korea
    • Explanation Sectional area : 82m2
      Extended Length : 2,060m
      Rock Type : Hard Rock
  • Korea Haeundae Doosan We've The Jeniss Residence Apartment Development

    • Period 2007.12 ~ 2011.08
    • Client Daewon Plus E&C
    • Location Busan, Republic of Korea
    • Explanation D2500 138hole 46.9M
      Oscillator+R.C.D
  • Korea Kangnam Ring City highway Construction Phase 5-1

    • Period 2007.11 ~ 2016.12
    • Client Gangnambeltway Corp
    • Location Seoul, Republic of Korea
    • Explanation Length 4.918km (Three Lane Road Tunnel in Both direction)
  • Korea New Sungnam Electric Power Transmission

    • Period 2007.11 ~ 2010.08
    • Client Korea Electric Power Corporation
    • Location Seongnam Gyeonggi, Republic of Korea
    • Explanation EPB
      LENGTH-2,297(M)
      DIAMETER-3,800(mm)
      Ground : Soft & Hard rock
Youtube
CS CENTER