Major Performance
-
Korea Gangnam Electric Power Transmission Line
-
Period
2008.10 ~ 2014.02
-
Client
Korea Electric Power Corporation
-
Location
Seoul, Republic of Korea
-
Explanation
Dual Mode(Open+EPB)
LENGTH-3,343(M)
DIAMETER-3,000(mm)
GROUND : gneiss
Equipment manufacturer: KAWASAWI Φ3,600mm, JAPAN
-
Korea Landfill of Neutae breakwater facility and Seawall Extension
-
Period
2008.10 ~ 2008.12
-
Client
DSME Co.,Ltd
-
Location
Geoje Gyeongsangnam-do, Republic of Korea
-
Explanation
30,586m (4drivers)
-
Korea Gyeongjeon Railway Line Double-Track Electrification Section Haman~Jinju / Gwangjung Tunnel
-
Period
2008.09 ~ 2015.01
-
Client
Gaya Railway Ltd.
-
Location
Gyeongnam, Republic of Korea
-
Explanation
Sectional area : 80m2
Extended Length : 2,251m
Rock Type : Soft/Hard Rock
-
Korea Centum Science Park Project
-
Period
2008.06 ~ 2010.04
-
Client
Centum Science Park Co.
-
Location
Busan, Republic of Korea
-
Explanation
earthworks : 68,487㎥
Continuous wall excavation(D800) : 4,134㎥
-
Qartar Doha North Sewerage Treatment &Associated Works Mico Tunneling work
-
Period
2008.05 ~ 2011.04
-
Client
ASHGHAL
-
Location
Doha, Qatar
-
Explanation
Slurry : Length - 33,367(M)
Diameter - 1,000~2,400(mm)
Stratum : Lime Stone, Midra shale
-
Korea Gwangyang Shipyard Site Preparation Project
-
Period
2008.05 ~ 2008.08
-
Client
Orient Shipyard Co.,Ltd.
-
Location
Gwangyang, Jeollanam-do, Republic of Korea
-
Explanation
Length : 147,011m
Ground : Sand gravel rayer
Mode : DH758-160M