  • Korea Gangnam Electric Power Transmission Line

    • Period 2008.10 ~ 2014.02
    • Client Korea Electric Power Corporation
    • Location Seoul, Republic of Korea
    • Explanation Dual Mode(Open+EPB)
      LENGTH-3,343(M)
      DIAMETER-3,000(mm)
      GROUND : gneiss
      Equipment manufacturer: KAWASAWI Φ3,600mm, JAPAN
  • Korea Landfill of Neutae breakwater facility and Seawall Extension

    • Period 2008.10 ~ 2008.12
    • Client DSME Co.,Ltd
    • Location Geoje Gyeongsangnam-do, Republic of Korea
    • Explanation 30,586m (4drivers)
  • Korea Gyeongjeon Railway Line Double-Track Electrification Section Haman~Jinju / Gwangjung Tunnel

    • Period 2008.09 ~ 2015.01
    • Client Gaya Railway Ltd.
    • Location Gyeongnam, Republic of Korea
    • Explanation Sectional area : 80m2
      Extended Length : 2,251m
      Rock Type : Soft/Hard Rock
  • Korea Centum Science Park Project

    • Period 2008.06 ~ 2010.04
    • Client Centum Science Park Co.
    • Location Busan, Republic of Korea
    • Explanation earthworks : 68,487㎥
      Continuous wall excavation(D800) : 4,134㎥
  • Qartar Doha North Sewerage Treatment &Associated Works Mico Tunneling work

    • Period 2008.05 ~ 2011.04
    • Client ASHGHAL
    • Location Doha, Qatar
    • Explanation Slurry : Length - 33,367(M)
      Diameter - 1,000~2,400(mm)
      Stratum : Lime Stone, Midra shale
  • Korea Gwangyang Shipyard Site Preparation Project

    • Period 2008.05 ~ 2008.08
    • Client Orient Shipyard Co.,Ltd.
    • Location Gwangyang, Jeollanam-do, Republic of Korea
    • Explanation Length : 147,011m
      Ground : Sand gravel rayer
      Mode : DH758-160M