Major Performance
Singapore Marina Coastal Expressway CONTRACT 486 / DCM
Period
2009.07 ~ 2010.09
Client
Land Transport Authority (LTA)
Location
Singapore
Explanation
DCM Length :
Construction 174,954m
improvement 434,5m
(D=1,200mm, 2 drives)
Korea Dobong area Electric Power Transmission
Period
2009.06 ~ 2014.04
Client
Korea Electric Power Corporation
Location
Seoul, Republic of Korea
Explanation
EPB+TBM , LENGTH-2,700(M)
DIAMETER-3,550(mm)
Ground : Weathered Rock, Soft & Hard
Korea Busan Northern Port Redevelopment Project (Phase 1-1)
Period
2009.06 ~ 2010.10
Client
Busan Port Construction Office
Location
Busan, Republic of Korea
Explanation
Length : 93,650(m), 4 drivers
Korea Busan New Port Breakwater Reinforcement
Period
2009.06 ~ 2010.10
Client
Busan Port Construction Office
Location
Busan, Republic of Korea
Explanation
DCM : 148,460m(4 drivers)
Korea Seoul Subway Line No.9 Section 915 -Phase 1
Period
2009.04 ~ 2015.03
Client
Seoul Metropolitan Infrastructure Headquarters
Location
Seoul, Republic of Korea
Explanation
Sectional area
- Widening Tunnel 126m2
- Station Tunnel(1) 336m2
- Station Tunnel(2) 170m2
- Double track tunnel 81m2
Extended Length : 392m
Rock Type : Soft / Hard Rock
Singapore Marina Coastal Expressway CONTRACT 485 / DCM
Period
2009.03 ~ 2010.12
Client
LTA
Location
Singapore
Explanation
69,107m for construction work
171,663m for improvement work
(D=1,200mm, 2drivers)